top of page

Bluebird Park Amphitheater

  • Writer: hbrown003
    hbrown003
  • May 14, 2021
  • 1 min read

The Bluebird Park Amphitheater construction is nearing completion!

Planning Design Studio assisted the City of Ellisville with the development of a master plan and construction documents to renovate an existing amphitheater in Bluebird Park. The planning effort included multiple public input sessions to select a community preferred plan for the renovation. The preferred concept plan provided improved ADA accessibility, seating areas, a 70’ x 30’ stage cover structure and landscape improvements. The City received a grant for Phase I implementation of the stage cover structure in 2020. PDS provided construction documents and construction period services for the amphitheater stage cover structure. We are excited about this new addition to the Ellisville Parks and Recreation system.


Comments


Planning Design Studio

MAILING ADDRESS:

2816 Sutton Boulevard, Suite 1, Saint Louis, Missouri 63143

Tel: 314-241-3600

Email: PDS-Info@planningdesignstudio.com

All content and images copyright © Planning Design Studio

CONTACT US:

  • Facebook
  • Instagram
  • LinkedIn
  • Youtube

Success! Message received.

bottom of page