Bluebird Park Amphitheater

The Bluebird Park Amphitheater construction is nearing completion!

Planning Design Studio assisted the City of Ellisville with the development of a master plan and construction documents to renovate an existing amphitheater in Bluebird Park. The planning effort included multiple public input sessions to select a community preferred plan for the renovation. The preferred concept plan provided improved ADA accessibility, seating areas, a 70’ x 30’ stage cover structure and landscape improvements. The City received a grant for Phase I implementation of the stage cover structure in 2020. PDS provided construction documents and construction period services for the amphitheater stage cover structure. We are excited about this new addition to the Ellisville Parks and Recreation system.


Recent Posts

See All

PDS Presents at MPRA Mini Conference

On December 9th, Scott Emmelkamp, ASLA and Scot Talbert presented virtually at the Missouri Parks and Recreation Mini Conference. The session was called “Park Facility Assessments 101: A ‘How To’ Guid